{"id":1770,"date":"2011-02-22T12:57:00","date_gmt":"2011-02-22T17:57:00","guid":{"rendered":"https:\/\/fondationrivieres.org\/?p=1770"},"modified":"2023-01-22T10:48:14","modified_gmt":"2023-01-22T15:48:14","slug":"projet-de-centrale-hydroelectrique-sur-la-riviere-jacques-cartier-a-shannon-assujettissement-a-des-audiences-publiques","status":"publish","type":"post","link":"https:\/\/fondationrivieres.org\/en\/projet-de-centrale-hydroelectrique-sur-la-riviere-jacques-cartier-a-shannon-assujettissement-a-des-audiences-publiques\/","title":{"rendered":"Hydroelectric power station project on the Jacques-Cartier River in Shannon \u2013 Subject to public hearings"},"content":{"rendered":"<p style=\"text-align: right;\" align=\"left\">Montreal, February 22, 2011<br \/>\nTRANSMISSION BY EMAIL<\/p>\n<p style=\"text-align: left;\">Mr. Pierre Arcand, Minister<br \/>\nMinistry of Sustainable Development, Environment and Parks<br \/>\nMarie-Guyart Building, 30th floor<br \/>\n675 Ren\u00e9-L\u00e9vesque Boulevard East<br \/>\nQuebec (Quebec) G1R 5V7<\/p>\n<h2 style=\"text-align: left;\">Subject: Hydroelectric power station project on the Jacques-Cartier River in Shannon \u2013 Subject to public hearings<\/h2>\n<p>Minister,<\/p>\n<p>The municipality of Shannon is currently carrying out various engineering studies to build a 3.3 megawatt power station on the Jacques-Cartier River. As the project is below the 5 megawatt threshold at which public hearings should be held, the Environmental Assessment Branch was not asked to comment on the project in question.<\/p>\n<p>However, we noted, on a plan produced by the firm BPR in December 2010 (\u201cTopographic and bathymetric curves\u201d plan attached), that the \u201cprojected flooded zone\u201d will extend to rue Dugas, i.e. close to &#039;a kilometer upstream. The entire surface area of the body of water will thus exceed 50,000 square meters, another threshold for being subject to public hearings.<\/p>\n<p>We have informed the Regional Directorate of Capitale-Nationale but the file will only be examined upon receipt of a request for a certificate of authorization for construction and including detailed plans and specifications. We consider this procedure ineffective since it risks costing citizens dearly with significant expenses in a project that could be refused or modified.<\/p>\n<p>Consequently, we ask you to mandate the Environmental Assessment Department to take the file before the loan by-law is adopted on March 7 and the detailed plans produced. Other issues should also be evaluated: the salmon resource, the practice of canoeing and kayaking activities, the preservation of culture and landscapes as well as the presence of contaminated soils.<\/p>\n<p>Please accept, Mr. Minister, the expression of our best feelings.<\/p>\n<p>Maryse Pallascio, vice-president<\/p>\n<p>CC. Professional association of engineers of the government of Quebec<\/p>\n<p><em>Photo: Radio-Canada\/Coralie Mensa<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>Montr\u00e9al, le 22 f\u00e9vrier 2011 TRANSMISSION PAR COURRIEL Monsieur Pierre Arcand, Ministre Minist\u00e8re du D\u00e9veloppement durable, de l\u2019Environnement et des Parcs \u00c9difice Marie-Guyart, 30e \u00e9tage 675, boulevard Ren\u00e9-L\u00e9vesque Est Qu\u00e9bec (Qu\u00e9bec) G1R 5V7 Objet : Projet de centrale hydro\u00e9lectrique sur la rivi\u00e8re Jacques-Cartier \u00e0 Shannon \u2013 Assujettissement \u00e0 des audiences publiques Monsieur le Ministre, La [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":52283,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[9],"tags":[57],"class_list":["post-1770","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-plaintes-lettres-aux-gouvernements","tag-hydroelectricite"],"_links":{"self":[{"href":"https:\/\/fondationrivieres.org\/en\/wp-json\/wp\/v2\/posts\/1770","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/fondationrivieres.org\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/fondationrivieres.org\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/fondationrivieres.org\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/fondationrivieres.org\/en\/wp-json\/wp\/v2\/comments?post=1770"}],"version-history":[{"count":0,"href":"https:\/\/fondationrivieres.org\/en\/wp-json\/wp\/v2\/posts\/1770\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/fondationrivieres.org\/en\/wp-json\/wp\/v2\/media\/52283"}],"wp:attachment":[{"href":"https:\/\/fondationrivieres.org\/en\/wp-json\/wp\/v2\/media?parent=1770"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/fondationrivieres.org\/en\/wp-json\/wp\/v2\/categories?post=1770"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/fondationrivieres.org\/en\/wp-json\/wp\/v2\/tags?post=1770"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}